- How do bathroom projects differ between new Star subdivisions and acreage homes?
- Newer Star homes usually ask for shower conversions and primary-suite upgrades, while the acreage properties lean toward larger, more custom retreats. We size the project to the house rather than applying a template, since Star's housing runs from builder-grade to semi-custom.
- Do you cover both sides of the Boise River in Star?
- Yes, we work across Star's north and south sides along the river corridor, as well as the Hidden Springs side. The approach shifts with the property — finish upgrades for the newer builds, more involved custom work for homes on land.
- How long will a bathroom remodel take in a newer Star home?
- A full bathroom typically takes three to five weeks on site, and a walk-in shower or tub-to-shower conversion one to two weeks. Design and material selections come first, and permitted work adds plan review and inspection scheduling to the calendar. Because newer homes rarely hide repairs, a Star project tends to run close to its original scope.
- Can we keep living at home while the primary bath is torn out?
- Yes, you can stay in the house during a bathroom remodel. The work is confined to one room, with floor protection and a cleanup at the end of each day. Expect noise during demolition, and plan to use another bathroom until the final walkthrough. All we need from you is access to the space on workdays.
- What decides the price of swapping a garden tub for a shower?
- The size of the new shower and the finishes you choose decide most of it. We price a Tub-to-Shower Conversion at $8,000 – $15,000 and a Walk-In / Custom Tile Shower at $12,000 – $22,000. In a newer Star home there is seldom hidden repair, so tile, glass, a bench or niche, and any drain relocation account for where you land in the range.
- What happens at the first visit for a home on acreage near Star?
- The first visit is a walk through the room that takes about an hour. We measure, look behind the finishes where we can, and on an acreage home check the floor framing, the electrical panel, and whether the property is on a well or septic system. A fixed written quote follows a few days later, listing scope, materials and the payment schedule.