Skip to content
A Division of Iron Crest Remodel(208) 775-8999
Boise Bath — bathroom remodeling in Boise and the Treasure Valley
A finished Meridian master bathroom with a tiled walk-in shower, linear drain, navy double vanity and quartz counter

Ada County · Idaho

Bathroom Remodeling in Boise, Idaho

From North End bungalows with one original bathroom to 1990s builder baths in West Boise, we remodel showers, tubs and full bathrooms across the city. About half of Boise homes date from 1970 to 1999, so most rooms have simply aged out.

  • Tub-to-Shower Conversions from $8,000
  • Fixed price in writing before work starts
  • 1-year workmanship warranty

Pictured: Meridian Master Bath. Built by Iron Crest Remodeling Group.

Free Boise bathroom estimate

A few quick details. We reply within one business day.

Idaho-registered contractor · RCE-6681702 · Fully insured · We reply within one business day (Mon–Fri).

  • Idaho-Registered & Insured

    RCE-6681702

  • 1-Year Workmanship Warranty

    Written, not implied

  • Fixed-Price Quotes

    Priced before work starts

  • Boise & the Treasure Valley

    A division of Iron Crest Remodeling Group LLC

Boise homes

The bathrooms Boise homes start with

Idaho's capital and largest city, where historic tree-lined neighborhoods meet new construction along the Boise River greenbelt.

01

The 1970 to 1999 builder bathroom

Roughly half of Boise's homes were built between 1970 and 1999, and the West Boise subdivisions out toward Cole and Ustick are typical of them. The bathroom is usually sound but generic: a one-piece fiberglass tub-shower, a basic vanity and lighting from the same decade. A remodel here generally replaces the fiberglass unit with a tiled walk-in shower or a new tub surround, updates the vanity and lighting, and leaves the plumbing where it is.

02

The mid-century Bench ranch bath

Ranch homes on the Bench, built largely from the 1940s through the 1960s, mostly still carry their original bathroom: colored tile, a compact layout and a tub-shower combination. Decades-old tile and surrounds come out, the walls get new waterproofing, and the tub often becomes a walk-in shower. These houses are single-story, which keeps access simple, so the open questions are the state of the old plumbing and whether the layout should be opened up.

03

The single North End bathroom

Early-1900s Craftsman bungalows, Victorians and Tudor cottages in the North End were built when one small bathroom served the whole house. Expect a cast-iron tub, plaster walls and waterproofing that aged out long ago, sometimes with original plumbing or knob-and-tube wiring behind them. The remodel modernizes the plumbing, waterproofing and layout while keeping the finishes in step with the period of the home, and it is sequenced for a household with nowhere else to shower.

What we build

Bathroom remodeling services in Boise

Walk-In Showers in Boise

In West Boise subdivisions a walk-in shower usually replaces a one-piece fiberglass tub-shower; in older neighborhoods it means reworking a tight original footprint.

$12,000–$22,000

Walk-In Showers details →

Tub to Shower Conversions in Boise

Bench ranches and 1980s hall baths both tend to have a tub-shower combination that converts to a tiled shower within the same footprint.

$8,000–$15,000

Tub to Shower Conversions details →

Full Bathroom Remodeling in Boise

With 42% of Boise homes built before 1980, a full remodel often starts by checking supply lines, drains and subfloor before finishes are chosen.

$15,000–$28,000 / $28,000–$60,000+

Full Bathroom Remodeling details →

Master Bathroom Retreats in Boise

Harris Ranch and East End homes lean toward a larger primary bath with a curbless shower, natural stone and finishes matched to the house.

$28,000–$60,000+

Master Bathroom Retreats details →

Accessible Bathrooms in Boise

About 27% of Boise households include someone 65 or older, and many older homes have one tight bathroom that has to work for everyone.

$15,000–$28,000 / $28,000–$60,000+

Accessible Bathrooms details →

Custom Tile & Stonework in Boise

Tile follows the house here, from period-appropriate patterns in a North End bungalow to large-format tile that visually opens a compact downtown condo bath.

$12,000–$22,000

Custom Tile & Stonework details →

Steam Shower Installation in Boise

Steam showers need vapor-tight construction and a dedicated generator circuit, so in an older home the electrical panel is checked before design goes further.

$12,000–$22,000

Steam Shower Installation details →

Curbless Showers in Boise

A flush shower entry depends on what is under the floor, so crawlspace framing in older homes is inspected before a curbless design is promised.

$12,000–$22,000

Curbless Showers details →

Wet Room Conversions in Boise

Where a bungalow has one small bathroom, putting tub and shower in a single waterproofed zone can recover floor space a separate enclosure would use.

$12,000–$22,000 / $15,000–$28,000

Wet Room Conversions details →

Aging-in-Place Bathrooms in Boise

Single-story Bench ranches suit staying put, and the bathroom changes are usually a low-threshold shower, grab-bar blocking and a clearer path through the room.

$15,000–$28,000 / $28,000–$60,000+

Aging-in-Place Bathrooms details →

Shower Remodeling in Boise

About half the city's homes date from 1970 to 1999, when a molded fiberglass unit set against bare studs was the standard shower.

$12,000–$22,000

Shower Remodeling details →

Bathtub Replacement in Boise

From North End cast iron to West Boise fiberglass units, each era's tub comes out differently and leaves a different alcove to rebuild.

Bathtub Replacement details →

Guest & Hall Bathroom Remodeling in Boise

In 1980s and 1990s subdivision homes the hall bath usually still has its one-piece fiberglass tub-shower, basic vanity and original lighting.

$15,000–$28,000

Guest & Hall Bathroom Remodeling details →

Small Bathroom Remodeling in Boise

Small bathrooms here run from the single original bath in a North End bungalow to a compact condo bath downtown, each measured before it is designed.

$15,000–$28,000

Small Bathroom Remodeling details →

Vanity & Countertop Replacement in Boise

A 1990s builder vanity is usually a same-footprint replacement, while North End plaster walls and compact Bench layouts call for more careful fitting.

Vanity & Countertop Replacement details →

Shower Door & Glass Installation in Boise

Aluminum-framed sliders from the 1970s through the 1990s are replaced with glass matched to what each surround can carry.

Shower Door & Glass Installation details →

Acrylic Shower & Wall Panel Installation in Boise

Builder fiberglass surrounds from the 1980s through the 2000s give way to multi-piece systems, and Bench tile comes off before panels go up.

Acrylic Shower & Wall Panel Installation details →

Published ranges, not quotes. Your price is fixed in writing after a free in-home consultation. How pricing works

Finished bathrooms

Recent work near Boise

  • A finished Meridian master bathroom with a tiled walk-in shower, linear drain, navy double vanity and quartz counter

    Meridian

    Meridian Master Bath

    Tub-shower replaced with a tiled walk-in shower; new double vanity

  • A finished bathroom in Star with a grey tiled tub surround, floating white vanity and backlit mirror

    Star

    River Ranch Bathroom, Star

    Full bathroom remodel — tiled tub surround, floating vanity, lit mirror

  • A finished Caldwell walk-in shower with a full-width tiled bench, grab bars, a long niche and a handheld shower head

    Caldwell

    Caldwell Accessible Shower

    Tiled walk-in shower with a full-width bench and grab bars

Completed bathrooms, built by Iron Crest Remodeling Group, Boise Bath's parent company. See the gallery

Boise at a glance

What the public record says about Boise homes

Median year Boise homes were built
1986
Census 2020–2024 estimates
Homes that are owner-occupied
63.2%
Census 2020–2024 estimates
Households with someone 65 or older
27%
Census 2020–2024 estimates
Nights a year at or below 32°F
108
NOAA normals · Boise Air Terminal

Quick answers

How old are homes in Boise?
The median Boise home was built in 1986 (margin of error ±2 years), 42% were built before 1980, and 13.1% since 2010, according to the Census Bureau's American Community Survey 2020–2024 estimates.
How cold do winters get around Boise?
NOAA's 1991–2020 climate normals for Boise Air Terminal, about 4 miles from Boise, average 108 nights a year at or below 32°F and 55 days at or above 90°F.

Permit details for Boise: Boise bathroom remodel permits

Published price ranges

Tub-to-Shower Conversion
$8,000 – $15,000
Walk-In / Custom Tile Shower
$12,000 – $22,000
Guest Bathroom Remodel
$15,000 – $28,000
Master Bathroom Remodel
$28,000 – $60,000+

Ranges drawn from quotes Boise Bath has issued, as of 2026-09. They are not a quote; your price is fixed in writing after an in-home consultation.

Sources for these figures

Boise bathrooms

Remodeling a bathroom in Boise

Across Boise as a whole, bathroom remodeling demand splits cleanly along the city's age lines: established neighborhoods drive full gut-and-rebuild work, while the growing edges generate finish-level upgrades. Because the city covers such a wide span of build eras, no two projects start from the same baseline, and an honest assessment up front matters more here than almost anywhere in the valley. Many homeowners begin with a single hardest-working bathroom before deciding whether to tackle a primary suite next. Demand stays steady year-round, with planning conversations often picking up over the slower winter months for spring installs.

Boise spans early-1900s Craftsman bungalows in the North End, mid-century homes on the Bench, and newer builds out in Southeast Boise and Harris Ranch — but the statistical middle of the city is none of those. Census data puts 6% of Boise homes at pre-1940 and 24% at 2000 or later, which leaves roughly half the city built between 1970 and 1999. That range means everything from original cast-iron tubs and tight, dated layouts to 1990s builder-grade baths ready for a personal upgrade.

Housing-age figures: U.S. Census Bureau, American Community Survey 2019–2023 5-year estimates, table B25034

Older North End and Bench homes often hide undersized, single-bathroom layouts and aging waterproofing, while newer subdivisions usually want their builder-grade showers and vanities brought up to the level of the rest of the house. Both are squarely in our wheelhouse.

Local considerations

Permits for Boise proper run through the City of Boise within Ada County, and older North End and Bench homes can surface surprises behind the walls — original plumbing, knob-and-tube wiring, or failed waterproofing — that are worth scoping before demolition. Knowing the home's era early helps set realistic expectations.

How it works

How a Boise project runs

Inside city limits, permits come from the City of Boise's Planning and Development Services Building Division, not Ada County. Cosmetic work such as new tile or a vanity in the same footprint needs no permit; relocating fixtures, adding circuits or altering structural walls does, and applications, fees and inspections run through the city's online system. The city recommends a consultation with its plumbing and mechanical inspectors before work starts. We pull the permits and manage the inspections. In the North End Historic District, interior bathroom work is not what design review targets, but enlarging a window or changing an exterior opening is a question for Boise Planning first.

Boise bathroom remodel permits, explained →

  1. 1

    Consultation & Design

    One visit

  2. 2

    Fixed Quote

    A few days after your visit

  3. 3

    Build

    Typically three to five weeks for a full bathroom

  4. 4

    Final Walkthrough

    One visit, plus punch-list time

  5. 5

    1-Year Warranty

    1 year

  6. See each stage in detail →

Not a call centre

The people who will build it

You work with one project manager from the first consultation through the warranty — the same person who measured your bathroom answers the phone when you call about it.

Boise Bath is a division of Iron Crest Remodeling Group LLC, so this is the same Treasure Valley crew behind every Iron Crest project.

  • Ben B., Project Manager at Boise Bath

    Ben B.

    Project Manager

    Ben focuses on bathroom and shower remodels and has built a home from the ground up — he understands every stage of a Treasure Valley build firsthand.

  • Russ S., Project Manager at Boise Bath

    Russ S.

    Project Manager

    Russ rebuilt and remodeled his own home from the studs out, with his own two hands — so he runs every Boise bathroom project with a true craftsman’s eye.

  • George S., Project Coordinator at Boise Bath

    George S.

    Project Coordinator

    With seven years in remodeling and a background in computer science, George orders the materials and keeps every Boise Bath project on schedule.

Areas we serve in & around Boise

the North EndEast Endthe Boise BenchSoutheast BoiseHarris RanchDowntown
Explore Boise neighborhoods

Nearby communities

Boise questions, answered

Bathroom remodeling in Boise: common questions

What kinds of bathroom projects are most common in Boise?
It runs the full range because the city's housing does. Older homes near the core tend toward full remodels that correct dated layouts and aging waterproofing, while newer Southeast Boise and Harris Ranch homes more often want builder-grade showers and vanities brought up a level. Both are routine here.
Do you work in all parts of Boise, including the outer subdivisions?
Yes — from Downtown and the North End out to Southeast Boise and the newer corridors. The approach changes with the neighborhood and the age of the home, so we scope each project to the house rather than applying a single template across the city.
How long does a full bathroom remodel take in Boise?
A full bathroom typically takes three to five weeks on site. That covers demolition and haul-away, rough plumbing and electrical, inspection, waterproofing, tile, then glass, vanity, fixtures, paint and trim. Design, material selections and permit review happen before the first day on site, and an older Boise home can add time if demolition uncovers something hidden.
What do older Boise homes tend to hide behind the bathroom walls?
Original plumbing, knob-and-tube wiring and failed waterproofing are the usual surprises in North End and Bench homes. Your quote is a fixed written price, and the only thing that can change it is something hidden, such as old plumbing, a rotted subfloor or past water damage. If that turns up, we price it with you before work continues.
Can we stay in the house while our only bathroom is remodeled?
Yes, you can stay, but a one-bathroom house needs a plan for the stretch when the room is out of service. Many North End bungalows and Bench ranches were built with a single bath, so we talk through the sequence at the consultation and tell you which stages take the room offline. Floor protection and a daily cleanup keep the rest of the house livable.
What does a bathroom remodel cost for a typical Boise home?
It depends on scope: a tub-to-shower conversion runs $8,000 – $15,000, a walk-in or custom tile shower $12,000 – $22,000, a guest bathroom remodel $15,000 – $28,000 and a master bathroom remodel $28,000 – $60,000+. In Boise the age of the house moves the number most, because old plumbing, plaster walls and layout changes add work a 1990s bath does not need.
An Idaho mountain lake ringed by evergreens

Ready to Transform Your Bathroom?

A fixed-price quote, a 1-year workmanship warranty, and a project manager who answers the phone. Let's build a space you'll love for years.

No obligation · Licensed & insured · Idaho registration RCE-6681702 · 1-year workmanship warranty

Call NowFree Estimate