- What kinds of bathroom projects are most common in Boise?
- It runs the full range because the city's housing does. Older homes near the core tend toward full remodels that correct dated layouts and aging waterproofing, while newer Southeast Boise and Harris Ranch homes more often want builder-grade showers and vanities brought up a level. Both are routine here.
- Do you work in all parts of Boise, including the outer subdivisions?
- Yes — from Downtown and the North End out to Southeast Boise and the newer corridors. The approach changes with the neighborhood and the age of the home, so we scope each project to the house rather than applying a single template across the city.
- How long does a full bathroom remodel take in Boise?
- A full bathroom typically takes three to five weeks on site. That covers demolition and haul-away, rough plumbing and electrical, inspection, waterproofing, tile, then glass, vanity, fixtures, paint and trim. Design, material selections and permit review happen before the first day on site, and an older Boise home can add time if demolition uncovers something hidden.
- What do older Boise homes tend to hide behind the bathroom walls?
- Original plumbing, knob-and-tube wiring and failed waterproofing are the usual surprises in North End and Bench homes. Your quote is a fixed written price, and the only thing that can change it is something hidden, such as old plumbing, a rotted subfloor or past water damage. If that turns up, we price it with you before work continues.
- Can we stay in the house while our only bathroom is remodeled?
- Yes, you can stay, but a one-bathroom house needs a plan for the stretch when the room is out of service. Many North End bungalows and Bench ranches were built with a single bath, so we talk through the sequence at the consultation and tell you which stages take the room offline. Floor protection and a daily cleanup keep the rest of the house livable.
- What does a bathroom remodel cost for a typical Boise home?
- It depends on scope: a tub-to-shower conversion runs $8,000 – $15,000, a walk-in or custom tile shower $12,000 – $22,000, a guest bathroom remodel $15,000 – $28,000 and a master bathroom remodel $28,000 – $60,000+. In Boise the age of the house moves the number most, because old plumbing, plaster walls and layout changes add work a 1990s bath does not need.